FAA Part 77
Filing

Form 7460-1 notices prepared, filed, and followed through to an FAA determination.

When 14 CFR Part 77 requires notice of proposed construction or alteration, CurvAero prepares FAA Form 7460-1, files it through the FAA's Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) system, and follows the case until the FAA issues its determination, including the Form 7460-2 supplemental notice. Our Part 77 filing service starts with the 14 CFR 77.9 notice criteria, so you file only when notice is required.

Diagram of FAA Part 77 imaginary surfaces beside an airport, with a tower penetrating the horizontal surface
45 daysMinimum notice before construction or a permit application
200 ftAbove ground notice required anywhere
18 monthsLife of a No Hazard determination, unless extended
5 daysTo report full height on Form 7460-2

Who has to file

Notice is owed before the first foundation is poured

Under 14 CFR 77.9, notice is required for construction more than 200 feet above ground, for anything that would penetrate a sloped notice surface around a public use or military airport or heliport, and for construction on such an airport. Temporary structures, such as construction cranes, are included.

Structures we file for

  • cell_towerCommunication towers
  • wind_powerWind turbines
  • apartmentBuildings
  • constructionConstruction cranes
  • electrical_servicesTransmission lines
  • add_roadRoads and rail near airports
fact_check

Not sure you need to file?

The CurvAero Part 77 Report checks a coordinate and a structure height against every 77.9 notice criterion, and tells you whether notice is required — with the rule and the measurement behind the answer. If it is, the report becomes the starting point for the filing.

About the Part 77 Report arrow_forward

Part 77 notice criteria

When 14 CFR 77.9 requires you to file Form 7460-1

Notice to the FAA is required when a proposed structure meets any one of the Part 77 notice criteria below. They are the tests behind every Part 77 filing, and the first thing we check. Each one is worked through with examples in our 14 CFR 77.9 notice criteria guide, and the filing itself in how to file Form 7460-1.

  • 77.9(a)

    Height

    Any construction or alteration more than 200 feet above ground level at its site, anywhere.

  • 77.9(b)(1)

    Near a long runway

    A 100:1 slope for 20,000 feet from the nearest point of the nearest runway of a qualifying airport whose longest runway is more than 3,200 feet.

  • 77.9(b)(2)

    Near a short runway

    A 50:1 slope for 10,000 feet from the nearest point of the nearest runway of a qualifying airport whose longest runway is 3,200 feet or less.

  • 77.9(b)(3)

    Near a heliport

    A 25:1 slope for 5,000 feet from the nearest landing and takeoff area of a qualifying heliport.

  • 77.9(c)

    Roads, railroads and waterways

    A highway, railroad or other traverse way whose height, once adjusted upward for the traffic on it, would exceed the 77.9(a) or (b) standards.

  • 77.9(d)

    On an airport

    Any construction or alteration on a qualifying airport or heliport, whatever its height.

What we deliver

From screening to supplemental notice

  1. 01

    Screen

    The site is checked against the 14 CFR 77.9 notice criteria first, so you file when notice is required and only then.

  2. 02

    Prepare

    Coordinates, ground elevation and overall height antennas, lightning rods and other appurtenances included assembled for the 7460-1.

  3. 03

    File

    The notice submitted through the FAA's OE/AAA system at least 45 days before construction starts or a permit application is filed, whichever is earlier.

  4. 04

    Track

    The case followed through the FAA's aeronautical study, with any request for more information answered as it comes.

  5. 05

    Resolve

    If the FAA issues a Notice of Presumed Hazard, we work out the height or location that would clear it, so the proposal can be amended rather than abandoned.

  6. 06

    Close out

    Supplemental notice on Form 7460-2 when the determination requires it: Part 1 before construction starts, and Part 2 within 5 days of reaching full height.

Part 77 filing: Part 1 and Part 2

Form 7460-2 supplemental notice

A Part 77 filing does not end with the Form 7460-1 determination. The FAA also expects Form 7460-2, in two parts, as the structure goes up. We prepare and file both.

  • Part 77 filing · Part 1

    Notice of construction start

    Part 1 of Form 7460-2 tells the FAA that construction is about to begin, at least 48 hours beforehand. It is the first step of the Part 77 filing after a determination is issued.

  • Part 77 filing · Part 2

    Notice of full height

    Part 2 of Form 7460-2 reports the structure's final height and position, within 5 days of reaching its greatest height. It closes the Part 77 filing.

gavel

The determination is the FAA's

CurvAero prepares, files and follows your notice. Whether the structure is a hazard to air navigation — and any marking or lighting it must carry — is decided by the FAA after its own aeronautical study, and every filing is made through the FAA's OE/AAA system.

FAA OE/AAA portal open_in_new

File with time to spare

Send us the site, the structure and the schedule. We will tell you whether notice is required and, if it is, handle the filing.